MFG-PU01-P01 · Concept training procedure draft · D1 · 29 October 2026
For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.
Equipment MFG-PU01 · model 1.0.0-concept · source: original concept, approved SOP absent.
MFG-PU01 · Pump and coupling training skid. Record draft D1 and model 1.0.0-concept.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Keep the driver and driven equipment identities distinct.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Record that the rendered gap is illustrative, not an alignment value.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
The model labels do not establish a safe removal procedure.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Use the labels; do not infer flow or service conditions from shape.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
An actual OEM/machine document is still required.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
No isolation or drain state can be verified in a web model.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
No torque, alignment, fastener or clearance specification is supplied.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Escalate to the maintenance owner and qualified reviewer.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Record observations, source revisions, holds, recovery and missing physical evidence; do not invent a result.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Keep this draft unapproved until the task owner accepts the sources, geometry, criteria, permissions and revision.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Qualified source, geometry and procedure review required before operational reuse.