MANUFACTURING / WORK INTELLIGENCE
Image libraryPracticeEON AI Ventures ↗

Concept training procedure draft

Component identity and layout rehearsal

MFG-EL01-P02 · Control-cabinet revision trainer · 12 steps for inert model familiarisation and reviewed decision practice.

Read the draft before the model.

Concept training procedure draft · D1 · 29 October 2026

For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

Original authored concept; no approved customer/OEM SOP supplied.

MFG-EL01-P02MFG-EL01MODEL 1.0.0-concept

12 authored steps

A sequence with visible evidence gates.

  1. Confirm equipment and task identity.

    MFG-EL01 · Control-cabinet revision trainer. Record draft D1 and model 1.0.0-concept.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  2. Confirm the inert training boundary.

    For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  3. Select PLC-01 in the named component picker.

    Observe its position, not a real controller configuration.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  4. Locate PSU-01 separately.

    No electrical connection or rating is asserted.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  5. Locate RELAY-01 and the terminal props.

    Use the exact model identifiers in the training record.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  6. Use the exploded layout to inspect mounting relationships.

    Exploded layout is not a disassembly sequence.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  7. Inspect DOOR-01 as a detached demonstration part.

    No door opening procedure or interlock is simulated.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  8. Reassemble the illustration.

    No actual inspection has occurred.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  9. Compare a proposed replacement identifier with a source request.

    Unknown applicability means HOLD, not substitution.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  10. Prepare the revision questions for engineering.

    Request accepted device list, drawing and change record.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  11. Prepare the evidence record.

    Record observations, source revisions, holds, recovery and missing physical evidence; do not invent a result.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  12. Request qualified review before reuse.

    Keep this draft unapproved until the task owner accepts the sources, geometry, criteria, permissions and revision.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

Keep the equipment and source together.

Open Control-cabinet revision trainer

Referenced components: CAB-01, DOOR-01, PLC-01, PSU-01, RELAY-01, REV-PLATE, TERM-01.

Required operating inputs: Permitted cabinet layout and drawings; device list; revision history; electrical work rules and qualified task owner.