Concept training procedure draft
Change-part relationship rehearsal
MFG-PK01-P02 · Packaging change-part bench · 12 steps for inert model familiarisation and reviewed decision practice.
Read the draft before the model.
For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.
Original authored concept; no approved customer/OEM SOP supplied.
12 authored steps
A sequence with visible evidence gates.
Confirm equipment and task identity.
MFG-PK01 · Packaging change-part bench. Record draft D1 and model 1.0.0-concept.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Confirm the inert training boundary.
For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Select HUB-01 and use Block lift.
The hub and segments separate vertically in this training illustration.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Inspect the shaft and key relationship.
Rendered contact does not validate key engagement.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Identify all STAR-ARM segments as one format concept.
These segments do not represent accepted production geometry.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Orbit to the transfer-guide side.
Record the illustrated transfer relationship.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Compare target part identity with the source request.
No OEM applicability table has been supplied.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Return the hub to the assembled state.
This is a model reset, not an installation check.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Describe what the expert would check physically.
Ask for approved criteria; do not invent force, clearance or torque.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Keep the rehearsal outcome bounded.
Familiarisation is complete; physical fit approval remains open.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Prepare the evidence record.
Record observations, source revisions, holds, recovery and missing physical evidence; do not invent a result.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Request qualified review before reuse.
Keep this draft unapproved until the task owner accepts the sources, geometry, criteria, permissions and revision.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Keep the equipment and source together.
Open Packaging change-part benchReferenced components: HUB-01, SHAFT-01, KEY-01, GUIDE-PK01, PART-PK-A, PART-PK-B.
Required operating inputs: Permitted setup sheets; current change-part identifiers; expert interview consent; key/shaft fit sources and ownership.