Concept training procedure draft
Expert context and format identity
MFG-PK01-P01 · Packaging change-part bench · 12 steps for inert model familiarisation and reviewed decision practice.
Read the draft before the model.
For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.
Original authored concept; no approved customer/OEM SOP supplied.
12 authored steps
A sequence with visible evidence gates.
Confirm equipment and task identity.
MFG-PK01 · Packaging change-part bench. Record draft D1 and model 1.0.0-concept.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Confirm the inert training boundary.
For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Locate HUB-01 and SHAFT-01.
Name the removable concept part and its fixed locating reference.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Find KEY-01.
Record why orientation needs a source-defined relationship.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Locate GUIDE-PK01.
Identify the transfer-guide context without inventing a gap value.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Compare PART-PK-A and PART-PK-B.
Keep previous and target format identities separate.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Ask the expert why the target part is chosen.
Capture the source or experience behind the decision, with permission.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Identify an exception the setup sheet does not explain.
Record it as an expert observation, not a released instruction.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
List source and interview permissions.
Reuse rights and review responsibility must be explicit.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Prepare the next-shift questions.
Unresolved key/shaft fit and guide criteria remain open.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Prepare the evidence record.
Record observations, source revisions, holds, recovery and missing physical evidence; do not invent a result.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Request qualified review before reuse.
Keep this draft unapproved until the task owner accepts the sources, geometry, criteria, permissions and revision.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Keep the equipment and source together.
Open Packaging change-part benchReferenced components: HUB-01, SHAFT-01, KEY-01, GUIDE-PK01, PART-PK-A, PART-PK-B.
Required operating inputs: Permitted setup sheets; current change-part identifiers; expert interview consent; key/shaft fit sources and ownership.