Concept training procedure draft

Coupling and guard visual rehearsal

MFG-PU01-P02 · Pump and coupling training skid · 12 steps for inert model familiarisation and reviewed decision practice.

Read the draft before the model.

Concept training procedure draft · D1 · 29 October 2026

For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

Original authored concept; no approved customer/OEM SOP supplied.

MFG-PU01-P02MFG-PU01MODEL 1.0.0-concept

12 authored steps

A sequence with visible evidence gates.

  1. Confirm equipment and task identity.

    MFG-PU01 · Pump and coupling training skid. Record draft D1 and model 1.0.0-concept.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  2. Confirm the inert training boundary.

    For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  3. Select COUPLING-01.

    Highlight the named component without treating it as a serviceable OEM coupling.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  4. Inspect the driver/driven relationship from both sides.

    Record visible layout observations only.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  5. Use Block lift to separate the guard illustration.

    This is an exploded training motion, not removal authorisation.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  6. Identify the now-visible coupling region.

    Visibility is not evidence of safe access or an isolated condition.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  7. Compare the two equipment pedestals.

    The model omits shims and adjustment engineering.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  8. List the physical measurements an approved method would need.

    The task owner defines alignment method and allowable values.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  9. Return the guard to the assembled illustration.

    No actual guarding check has occurred.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  10. Mark the rehearsal as a visual familiarisation.

    Keep measured-condition acceptance open.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  11. Prepare the evidence record.

    Record observations, source revisions, holds, recovery and missing physical evidence; do not invent a result.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  12. Request qualified review before reuse.

    Keep this draft unapproved until the task owner accepts the sources, geometry, criteria, permissions and revision.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

Keep the equipment and source together.

Open Pump and coupling training skid

Referenced components: MOTOR-01, COUPLING-01, GUARD-01, PUMP-01, SUCTION-01, DISCHARGE-01.

Required operating inputs: Approved OEM service documents; isolation requirements; coupling/guard details; alignment criteria and a qualified reviewer.