Concept training draft
Equipment and service-source briefing
MFG-PU01-P01 · 12 steps · draft D1
ExploreLive browser 3D viewer
Loading the local GLB…
Select a component in the model or picker. Drag to orbit; pinch or scroll to zoom.
Exploded layout is an illustration, not a disassembly sequence. Scene units and motions are not accepted engineering dimensions or kinematics.
Inspect a stopped pump/coupling concept and preserve the distinction between observation and a measured condition.
Unpowered concept only. No lubrication, alignment, torque or guard-removal instruction for a real machine.
Approved OEM service documents; isolation requirements; coupling/guard details; alignment criteria and a qualified reviewer.
Read source and version notesConcept training drafts
Use the parent tools with permitted sources and a qualified reviewer. This website has no native lesson or operational guidance session.