Concept training procedure draft
Equipment and service-source briefing
MFG-PU01-P01 · Pump and coupling training skid · 12 steps for inert model familiarisation and reviewed decision practice.
Read the draft before the model.
For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.
Original authored concept; no approved customer/OEM SOP supplied.
12 authored steps
A sequence with visible evidence gates.
Confirm equipment and task identity.
MFG-PU01 · Pump and coupling training skid. Record draft D1 and model 1.0.0-concept.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Confirm the inert training boundary.
For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Locate MOTOR-01 and PUMP-01.
Keep the driver and driven equipment identities distinct.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Identify COUPLING-01 between them.
Record that the rendered gap is illustrative, not an alignment value.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Locate GUARD-01 and its side panels.
The model labels do not establish a safe removal procedure.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Find SUCTION-01 and DISCHARGE-01.
Use the labels; do not infer flow or service conditions from shape.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Compare the concept ID with the service-document request.
An actual OEM/machine document is still required.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
List stored-energy and fluid questions for the task owner.
No isolation or drain state can be verified in a web model.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Record missing coupling and guard criteria.
No torque, alignment, fastener or clearance specification is supplied.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Hold a real service instruction until sources arrive.
Escalate to the maintenance owner and qualified reviewer.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Prepare the evidence record.
Record observations, source revisions, holds, recovery and missing physical evidence; do not invent a result.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Request qualified review before reuse.
Keep this draft unapproved until the task owner accepts the sources, geometry, criteria, permissions and revision.
Hold if: Identity, source applicability or required evidence is missing or inconsistent.
Keep the equipment and source together.
Open Pump and coupling training skidReferenced components: MOTOR-01, COUPLING-01, GUARD-01, PUMP-01, SUCTION-01, DISCHARGE-01.
Required operating inputs: Approved OEM service documents; isolation requirements; coupling/guard details; alignment criteria and a qualified reviewer.